Exterior Remodeling

One Contractor for Your Home’s Entire Exterior


Your home’s exterior is one continuous water-management system, not six unrelated jobs. Sky Pro Remodeling plans siding, roofing, flashing, trim, paint and hardscape in the correct sequence, so every seam sheds water the way it was designed to.

  • Siding and trim replacement
  • Roofing, gutters and drainage
  • Exterior painting and finishes
  • Concrete, walkways and entries
Overview

Why the Exterior Has to Be Treated as One System


Most exterior failures in Puget Sound homes are not material failures. They are detail failures at the boundaries between trades: housewrap lapped the wrong direction, a kick-out flashing missing where a roof edge dies into a wall, a deck ledger fastened through siding with nothing behind it, a downspout discharging two feet from the foundation. Every one of those sits precisely where a separately hired roofer, siding crew and painter hand responsibility to one another.

Much of the Eastside housing stock was framed between the 1960s and the 1990s, when hardboard lap, T1-11 panel and face-nailed cedar were installed tight to the sheathing with no drainage gap behind them. Water gets past the cladding at fasteners and butt joints, has nowhere to drain, and sits against sheathing through a wet season that runs most of the year. That is the origin of the soft plywood and rotted bottom plates we find once siding comes off.

A proper exterior renovation fixes the water path first and appearance second. We sequence from the top down and the outside in, so roofing and flashing are resolved before cladding, cladding before trim, and trim before paint.

Design Direction

Exterior Design Directions That Suit Homes Here


The right direction usually comes from the roofline and massing your house already has, not from a photo of something built somewhere else.

Northwest Contemporary

Deep overhangs, generous glazing, low-slope or shed rooflines, and mixed cladding such as dark fiber cement panel with warm cedar accents. Contrast comes from material and shadow rather than color saturation, which flattens under grey winter light. Panel systems are unforgiving of framing out of plane, so wall straightening often joins the scope.

Updated Craftsman

Tapered columns on substantial bases, wide trim, exposed rafter tails, shingle accents in gables, and a covered entry with real depth. It suits the many Eastside homes already carrying Craftsman cues and forgives irregular older framing. All that horizontal trim is exposed end grain, so back-priming matters more here.

Mid-Century Refresh

Long low horizontals, wide fascia bands, post-and-beam entries, and a restrained two-color scheme that lets the roofline work. It fits the daylight ramblers and split-levels common in Bellevue and Kirkland. Walls from this era often have minimal insulation and no rainscreen, so an honest refresh is an assembly upgrade behind a period-correct face.

Modern Farmhouse

Vertical board-and-batten fields, crisp white trim, black window frames, standing-seam accents and a strong gabled entry. The high-contrast trim still reads clearly on a dark February afternoon. Near-white finishes show organic staining quickly in a damp climate, so overhang depth and gutter performance deserve discussion up front.

Traditional and Tudor Restoration

Brick or stone bases, stucco fields, half-timber detailing, steep pitches and heavy doors kept in their original vocabulary. This is the right call when a home’s character is the reason it is worth what it is worth. Stucco and masonry repairs carry cure and matching requirements, so schedule expectations differ.

How We Work

How the Work Actually Unfolds


Exterior projects follow a predictable order, and knowing it in advance is what keeps a schedule honest.

Walkthrough and Condition Assessment

We walk the perimeter with you, check the roof, read grade and drainage, probe suspect trim, and open small test areas where evidence suggests hidden damage. This is also when we flag conditions that change scope, such as pre-1978 paint or older materials needing testing.

Scope, Design Direction and Written Estimate

We define which elevations, systems and materials are included, and what happens if sheathing repair is needed beyond what is visible. Unknown-condition allowances go in writing, so a rot discovery becomes a documented adjustment rather than an argument in week three.

Permitting and Jurisdiction Review

Requirements differ between Bellevue, Kirkland, Redmond, Issaquah, unincorporated King County and Seattle, so we confirm what applies before mobilizing. Reroofing, structural repair, altered openings and added impervious surface commonly trigger permits or drainage review.

Site Protection and Staging

Landscaping, decks, HVAC equipment and windows get covered, containment is set where required, and staging is agreed with you. On occupied homes we plan which elevations open on which days, so the house is never left unprotected overnight.

Tear-Off and Substrate Inspection

Old cladding and roofing come off, and sheathing, framing and existing flashing get inspected while everything is visible. Conditions are photographed, and any structural repair or missing flashing is corrected before it disappears behind new work.

Weather Barrier, Flashing and Insulation

The drainage plane goes on with correct lapping, openings are flashed, penetrations are sealed, and required insulation and air sealing happen while the wall is open. What Washington’s energy code requires depends on the code version your jurisdiction has adopted and how much of the assembly is altered.

Cladding, Roofing, Trim and Finish

Siding, roofing, trim and hardscape are installed in sequence, followed by caulking, priming and finish coats scheduled around workable weather. Coating application depends on substrate moisture and surface temperature, not just the forecast, so finish timing carries real flexibility.

Punch List, Cleanup and Handover

We walk the perimeter with you again, correct punch items, clear debris and magnet-sweep for fasteners, and confirm downspouts and grade behave as intended. You receive documentation of what was installed and a plain-language maintenance rhythm.

What You Get

What a Full Exterior Renovation Covers


A whole-exterior scope can include any of the following, in whatever combination your home actually needs.

Siding Replacement and Rainscreen Detailing

We strip the old cladding, repair sheathing, install a continuous weather-resistive barrier, and flash every penetration before new siding goes on. Most walls also get a vented drainage gap behind the cladding, so water that gets past the face has a path down and out.

Roofing, Gutters and Site Drainage

Roof replacement covers deck inspection, underlayment, valley and step flashing, edge metal, and soffit-to-ridge ventilation. We also size and route gutters and downspouts, because a good roof draining into a failed tightline still soaks the foundation.

Trim, Fascia and Soffit Rebuild

Rot appears first at horizontal surfaces and end grain: fascia, rake boards, window casings and column bases. We replace failed members, back-prime cut ends, and detail sills so trim sheds water instead of trapping it behind caulk.

Exterior Painting and Coatings

Preparation is most of a paint job that lasts: washing, scraping, sanding, spot-priming bare substrate and sealing joints properly. Coatings get matched to the substrate, because what performs on fiber cement does not perform on old cedar or stucco.

Windows, Doors and Opening Flashing

If siding is coming off anyway, that is the cheapest moment to replace tired windows and doors, since the openings are already exposed. Pan flashing, sill slope and correct lapping of the barrier over the head flange keep a new window from leaking.

Concrete, Walkways and Entry Hardscape

Driveways, walkways, steps, porch slabs and retaining elements get evaluated for base condition and slope. Grade falling toward the foundation undoes everything else, so drainage direction is settled before forms are set.

Not Sure Whether It Is Repair or Replacement?

A perimeter walkthrough with moisture readings usually answers that question in a single visit. Call (206) 825-2773 to schedule an exterior assessment.

Materials & Finishes

Comparing Cladding and Exterior Finish Materials


Material selection here is mostly a question of how a product behaves when it stays damp and how often it wants attention.

OptionBest ForConsiderationsRelative Cost
Fiber cement lap and panelLong service life with predictable maintenanceHeavy and brittle to handle; cutting needs dust control; joints and end cuts must be sealed and flashed correctlyModerate
Engineered wood sidingReal wood texture with easier handling and fewer jointsTreated but still wood-based, so cut ends, ground clearance and gutter performance are non-negotiableModerate
Western red cedarCharacter homes and accent fields where grain is the pointNeeds a ventilated rainscreen and a real maintenance schedule; moss on shaded elevations is normal hereHigher
Vinyl sidingBudget-driven replacement, modest appearance expectationsLimited darker colors and visible seams; hides rather than solves a moisture problemLower
Metal panel and standing seamContemporary elevations, accent walls, small entry roofsExcellent shedding and longevity; needs care at transitions and dissimilar-metal contactHigher
Stucco and modern plasterTraditional, Mediterranean and Tudor elevationsPerformance depends entirely on the drainage plane behind it; older applications without one hide damageHigher
Brick and stone veneerBases, chimneys, columns and entry surroundsNeeds proper weeps, flashing and a clear air space; adds structural load that must be supportedHigher

final material choice depends on site conditions and a written estimate

Investment

What Moves the Number on an Exterior Project


Exterior pricing is driven less by square footage than by access, complexity and what turns up behind the old cladding.

Wall Area, Stories and Access

Tall elevations, steep lots and tight side yards mean scaffolding or lift equipment instead of ladders, which adds setup time to every task on that wall. Access is often a bigger driver than the cladding material itself.

Elevation Complexity

Gables, dormers, bays, multiple rooflines and heavy trim multiply the cuts, transitions and flashings required. Two homes with identical wall area differ sharply in labor when one is a simple box and the other has eleven inside corners.

Condition of What Is Underneath

Sound sheathing means the new assembly goes straight on; soft plywood, rotted framing or botched earlier flashing repairs mean carpentry before cladding. This is the single largest source of scope change on exterior work.

Material and System Selection

Products vary in unit cost, but the bigger swing is the system around them: a full vented rainscreen, continuous exterior insulation, or standing seam over a conventional composition roof. Specialty finishes also affect lead time.

Hazardous Material Handling

Pre-1978 paint requires lead-safe work practices, and older siding, roofing and mastic products may require testing and regulated removal before demolition. These are legal requirements rather than optional line items, and they affect cost and schedule.

Permitting, Drainage and Site Requirements

Permit review, added impervious surface, stormwater requirements, steep-slope conditions and tree or utility protection each add engineering, documentation or site work. These are jurisdiction-specific and confirmed early rather than discovered midstream.

No responsible exterior number can come from a photo or a phone call. Cladding condition, sheathing condition, access and jurisdiction requirements have to be seen in person, so pricing follows an on-site inspection and arrives as a written, itemized estimate.

Why Sky Pro

Reasons Homeowners Bring the Whole Exterior to One Company


Consolidating exterior scope is not just convenient; it changes how the details get built.

The Transitions Have an Owner

Roof-to-wall, wall-to-deck, wall-to-window and wall-to-grade are where exteriors leak, and they are exactly the points that fall between separately hired trades. Under one contract, those junctions are built by a team that cannot pass them off.

Correct Sequencing

Painting before flashing repair, or landscaping before drainage correction, means paying for the same work twice. We schedule top-down and outside-in so no finish is applied over an unresolved layer.

Built for This Climate

Drainage gaps, back-priming, ground clearance, gutter performance and moss management on shaded elevations are not upsells here. They are what makes an exterior survive a wet season that runs most of the year.

Experience With Older Eastside Housing

Homes from the 1960s through the 1990s here share a recognizable set of problems: hardboard and T1-11 cladding, missing kick-out flashings, shallow overhangs and buried downspout tightlines. Knowing where to look shortens discovery.

One Point of Contact

You get a single schedule, a single invoice sequence and one person who knows the status of every elevation. That matters most when weather moves work around and someone has to re-plan the whole board.

Documentation You Can Keep

Photos of open walls, records of what was found and installed, and a written maintenance rhythm stay with the house. That record earns its keep years later, whether you are chasing a stain or answering a buyer’s inspector.

Client Reviews

What Our Clients Say


Common Questions

Frequently Asked Questions


What order should exterior work follow if I cannot do everything at once?

Work from the top down and control water before appearance. Roofing, flashing, gutters and drainage come first, because everything below depends on them. Siding and trim repair follow, then paint and cosmetic hardscape. If siding is coming off within a couple of years, repainting it now is wasted money.

Can new siding go over the existing siding to save money?

It is possible, but we rarely recommend it. Covering the old cladding hides the sheathing you most need to inspect, complicates flashing where trim and jamb depths change, and can trap moisture in a wall already struggling to dry. We cannot stand behind what we have not seen.

Do I need a permit for exterior work in Bellevue or elsewhere on the Eastside?

That depends on scope and jurisdiction, so it has to be confirmed for your address. Reroofing, structural repair, changing openings, taller retaining walls and added impervious surface commonly require permits or drainage review, while like-for-like siding replacement sometimes does not. Hillside and shoreline lots add further requirements.

Can exterior work be done during the rainy season?

Much of it can, with planning. Tear-off and dry-in are managed elevation by elevation so no wall is left open. Coatings are the real constraint, because paint and many sealants depend on substrate moisture content and surface temperature, not just on whether the afternoon is dry.

How do I tell whether siding needs replacement or just repair and repainting?

Look for patterns rather than isolated blemishes. Swelling along the bottom edges of multiple boards, soft spots at butt joints, paint failing repeatedly in the same places, and musty odors or discolored drywall on exterior walls point to a system problem. Moisture readings and one test opening usually settle it.

What is a rainscreen, and does my house need one?

A rainscreen is a ventilated drainage gap between the weather barrier and the back of the cladding, usually created with furring strips. Water that gets past the face drains out, and moving air dries what remains. In our climate that drying path separates a wall that lasts from one that quietly deteriorates.

My home was built before 1980. Does that change anything?

Yes, in two ways. Homes built before 1978 are presumed to have lead-based paint unless testing shows otherwise, which requires lead-safe work practices. Older cladding and roofing may contain asbestos, which generally requires a survey before renovation or demolition plus regional notification. Both affect method, cost and schedule.

Should I replace windows at the same time as siding?

If the windows are near the end of their life, this is the least expensive and least disruptive moment. The openings are already exposed, so pan flashing, sill slope and integration with the weather barrier get done properly instead of retrofitted. Doing it later means cutting new joints into new siding.

Related Services

Further Reading on Exterior Projects


Siding Remodeling in Bellevue, WA – Boost Your Home’s Curb Appeal with SkyPro Remodeling

A closer look at siding replacement specifically, including what changes once the old cladding comes off.

Roof Installation in Bellevue, WA – Protect Your Home with SkyPro Remodeling

Useful background on the roofing side of an exterior project, which sets the schedule for everything below it.

Washington Home Remodeling: Choosing Materials That Last

Worth reading before you settle on cladding and finishes, since durability in this climate depends more on assembly than on brand.

Get Your Exterior Scoped and Priced in Writing

We inspect on site, document what we find, and give you an itemized written estimate you can actually compare. Reach Sky Pro Remodeling at (206) 825-2773.

Service Areas

Exterior Renovation Across the Eastside and Greater Seattle


Sky Pro Remodeling handles exterior renovation for homeowners in Bellevue, Kirkland, Redmond, Sammamish, Issaquah, Bothell, Renton, Mercer Island and throughout greater Seattle. Working across these communities means we see the same wall assemblies, drainage conditions and permitting requirements repeatedly, which shortens assessment and reduces surprises once the cladding comes off.

Do not see your neighborhood? Call (206) 825-2773 — we regularly work throughout King County.

Where We Work

Serving Bellevue and the Greater Seattle Area


We serve homeowners throughout Bellevue, the Eastside and the greater Seattle area.

Get Started

Request an Exterior Consultation


Tell us what is happening with your siding, roof, trim or entry and we will arrange a walkthrough. You will get a clear scope, honest sequencing advice and a written estimate before any work begins.

Appointment Request Form

Let us know how we can help you!

Click To Call