A kitchen renovation renews the room you already have. Sky Pro Remodeling replaces cabinets, surfaces, lighting and worn-out systems while keeping the footprint that already works, so the money goes into what you touch every day rather than into moving walls.




















Homeowners use the words renovation and remodel interchangeably, but on a jobsite they describe different amounts of work. A remodel usually reconfigures the room: walls move, the sink relocates, an opening gets widened into the dining room. A renovation keeps the existing layout and rebuilds everything inside it. Cabinets come out and new ones go in, the countertop and backsplash are replaced, flooring is redone, lighting and outlets are brought up to current code, and the appliances are updated. The plumbing stack, the gas line and the load-bearing walls stay where they are.
That distinction matters more than it sounds. The most expensive parts of a kitchen project are almost always the ones that involve structure and relocated services. Moving a sink to the other side of the room means opening the floor, rerouting drain and vent piping at the correct slope, and often coordinating with a framing repair. Keeping the sink where it is removes that entire category of cost and schedule risk. A renovation puts the budget into cabinetry, surfaces, light and function instead.
Most homes on the Eastside are good candidates. Bellevue, Kirkland and Redmond are full of ramblers and split-levels from the 1950s through the 1970s, and Seattle neighborhoods add bungalows and boxes from decades earlier. Those kitchens were laid out sensibly for their time. What has aged badly is everything else: dropped soffits that waste a foot of wall above the cabinets, a single circuit feeding the whole room, no ventilation to the exterior, and finishes that have absorbed thirty or forty years of steam and grease. A renovation addresses all of that without asking you to rethink the house.

This kitchen was rebuilt as a full two-tone flat-slab installation, pairing wood-grain veneer wall cabinets and a full-height pantry/refrigerator surround with handleless matte white base cabinets. Light quartz-look countertops run the L-shaped perimeter and continue onto a large peninsula that faces the adjoining living space, with the counter edge finished square and clean where it meets the opening. A glossy dark charcoal-blue subway tile backsplash wraps the full run and carries up behind the range to meet a white wall-mounted chimney hood. Lighting was reworked with a grid of recessed cans across the sloped and beamed ceiling plus a brass oval-ring globe pendant over the peninsula. Plumbing and appliance work is visible as well: an undermount sink under the window with a matte black pull-down faucet, a slide-in electric range, integrated dishwasher panel run, and a speckled terrazzo-look floor carried throughout.
Style: Modern
This kitchen was rebuilt with a full run of white shaker cabinetry, including uppers to the soffit, deep drawer banks, and a tall pantry cabinet flanking the range wall. Light stone-look quartz-style countertops were installed with a clean square edge across the perimeter and carried onto a new seated island with a paneled base and integrated outlet. The plumbing package includes a large undermount single-bowl stainless sink with a pull-down brushed nickel faucet and a matching counter-mounted soap dispenser. Appliance work covers a stainless gas range with an over-the-range microwave, a stainless dishwasher integrated into the cabinet run, and a french-door refrigerator set into its own cabinet bay. Lighting and finishes were updated throughout with recessed cans, a pair of clear glass pendants over the island, brushed nickel bar pulls, and large-format light tile flooring.
Style: Transitional
A renovation touches every surface and every system in the room, even when the walls stay put.
Cabinets, counters, flooring and backsplash come out down to framing and subfloor, with plastic containment and floor protection through the path to the door. Dust from a kitchen tear-out travels farther than people expect, so sealing the room and covering the route out matters as much as the demolition itself.
The dropped soffit above the upper cabinets is one of the clearest markers of a mid-century kitchen, and removing it lets cabinets run to the ceiling for real storage. Soffits often conceal ductwork, a plumbing vent or old wiring, so what is inside gets verified before anything is committed to the drawings.
New boxes are set to a level layout line and shimmed to the actual floor, which in an older home is rarely flat. Drawer banks, roll-out shelving, a dedicated pantry cabinet and soft-close hardware are decided during design rather than picked from whatever the supplier has on hand.
Counters are templated after cabinets are installed so the fabricator is measuring the real room, not the plan. Sink and faucet cutouts, the disposal, filtered water lines and the backsplash termination all get sequenced so nothing is field-cut in place.
Kitchen circuits are the part of an older home most likely to be out of date, and a renovation is the practical moment to fix it. That generally means separate small-appliance branch circuits, GFCI protection at counter receptacles, dedicated circuits for the dishwasher and disposal, and receptacle spacing that meets today’s requirements rather than the 1962 version.
A hood that actually vents to the exterior is one of the most valuable upgrades in a damp climate, and the duct run is planned before cabinets are ordered. Flooring, drywall repair, paint, trim and toe-kick close out the room, with appliance install and a working punch list at the end.
Material choices in a renovation are judged on how they behave after ten years of steam, spills and traffic, not how they photograph on day one.
| Option | Best For | Considerations | Relative Cost |
|---|---|---|---|
| Engineered quartz countertop | Households that want a surface they never have to think about | Non-porous and consistent slab to slab, but it can discolor under sustained heat, so a trivet habit matters near the range | Moderate to high |
| Natural granite or quartzite countertop | Owners who want visible geology and unique movement | Needs periodic sealing and slab-by-slab selection, since a sample chip tells you very little about the piece you receive | Moderate to high |
| Porcelain tile flooring | Kitchens that open onto a mudroom or back door where wet shoes land | Extremely durable and indifferent to moisture, but it is hard underfoot and the subfloor must be stiff enough to prevent grout cracking | Moderate |
| Engineered hardwood flooring | Continuity with hardwood that already runs through the rest of the house | Handles humidity swings better than solid plank, though standing water at the dishwasher still needs to be caught early | Moderate to high |
| Luxury vinyl plank flooring | Rental properties, basements and budget-conscious renovations | Waterproof and forgiving over an imperfect subfloor, but it dents under point loads and will not be refinished later | Low to moderate |
| Painted plywood-box cabinetry | Most renovations, and any kitchen in a damp climate | Plywood boxes tolerate moisture far better than particleboard at the sink base and toe-kick; painted finishes show wear at high-touch edges over time | Moderate |
final material choice depends on site conditions and a written estimate
The condition of the wiring, plumbing and floor behind your cabinets determines most of what a renovation costs. Call (206) 825-2773 to schedule a walk-through.
These directions all work inside a fixed footprint, which is the constraint a renovation is built around.
Flat recessed-panel doors, a simple square edge on the counter, and hardware that reads quiet rather than decorative. It is the safest choice in a house you may sell in under a decade, because it sits comfortably in a craftsman, a rambler or a newer build. The design consideration is proportion: on a tall run of cabinets the rail width should grow slightly or the doors start to look thin.
Slab doors in a rift-cut oak or walnut veneer paired with a matte painted perimeter, minimal hardware, and long horizontal lines. It suits open plans and homes with good glazing, where the cabinetry is meant to recede and the wood does the work. Because slab doors show every deviation, the cabinet run needs a level, plumb reference and consistent reveals, which takes more setting time than a framed door would.
A darker or wood-toned island against a lighter perimeter, often with a different counter material on the island. This is the most forgiving way to add character to a galley or L-shaped kitchen that cannot be reconfigured, since the island carries the color and the walls stay bright. Keep the two counter materials in the same finish family, or the room reads as two unrelated projects.
Flat doors with integrated or thin-profile pulls, a horizontal grain direction, and a restrained palette that respects the original architecture. It fits the split-levels and ramblers common across the Eastside, where a heavy traditional kitchen fights the house. The trap is going too literal; period-correct colors date quickly, while period-correct proportions do not.
Painted cabinetry in warm whites and greys, pale wood accents, and open or glass-fronted uppers on one wall. It is a direct response to the grey light of a Puget Sound winter, and it makes a north-facing kitchen usable on a dark February afternoon. Pair it with warm-temperature, high color-rendering lighting, because cool LED strips over cool paint make food and skin tones look flat.
The sequence below is what keeps a kitchen renovation predictable, because most of the surprises are found and priced before demolition starts.
We look at the panel, the sink base, the floor structure and the ceiling above the cabinets before talking about door styles. The age of the house tells us what to expect, and what we find determines whether the electrical and plumbing scope is minor or significant.
Even inside a fixed footprint there are real decisions: drawers instead of lower doors, where the trash pull-out lands relative to the sink, whether the microwave leaves the counter, and how tall the uppers run. Selections for cabinetry, counters, tile, flooring and fixtures are locked here, because changing them later is what moves schedules.
You receive a document that states what is included, what materials were priced, and what is explicitly excluded. An allowance is used only where a choice genuinely has not been made yet, and it is labeled as an allowance rather than buried in a lump sum.
Electrical and plumbing work generally requires its own permit even when no walls move, and cabinetry lead times are the longest item on the calendar. Both are started well before demolition so the crew is not waiting on a plan reviewer or a truck.
The room comes apart, containment goes up, and everything behind the cabinets becomes visible for the first time. This is when knob-and-tube remnants, an undersized drain, rot at an exterior wall or a soffit full of ductwork shows itself, and any change to the scope is priced in writing before work continues.
New circuits are pulled, plumbing is adjusted for the new sink and dishwasher, the hood duct is run to its exterior termination, and any framing correction is made. Inspections happen at this stage while everything is still open, which is exactly why nothing gets closed up early to look like progress.
Cabinets are set and leveled to a single line, then the countertop is templated against the installed boxes. There is a natural pause of a week or more while the counter is fabricated, and the kitchen is left functional enough during that window to get by.
Counters, backsplash, flooring transitions, paint, hardware and appliance connections finish the room. We walk it with you, build a punch list, correct it, and hand over documentation for what was installed.
Two kitchens of identical square footage can land far apart, and these are the variables that explain the gap.
Cabinetry is usually the single largest line item, and cost scales with linear footage, box material, drawer count and finish. A full-height wall of drawers with soft-close hardware is a different product than a base run with a single shelf, even though both are called cabinets.
If the kitchen runs on one or two original circuits, bringing it current means new home runs to the panel, and sometimes the panel itself is out of capacity. In older Seattle homes, finding active knob-and-tube in the walls turns an electrical update from a half-day item into a significant portion of the project.
Keeping the sink and range in place is the biggest cost lever a renovation has. Shifting a sink even a few feet can mean opening the floor, rerouting drain and vent at the correct fall, and the framing repair that follows.
Slab price is only part of it. Seam count, a waterfall end, an undermount sink cutout, an eased versus mitered edge and a long unsupported overhang all add fabrication labor on top of the material.
A hood that has never vented outside needs a duct path, and where that path lands on an exterior wall or through the roof affects both cost and finish work. Washington’s energy code also requires a makeup air provision once a hood moves enough air, which adds a duct, a damper and sometimes a tempering component.
Out-of-level floors, an unstable subfloor, rot at an exterior wall behind the sink, or a wall that is not as plumb as it looks all cost time to correct properly. A thorough pre-demolition assessment narrows this considerably, but no one can see through drywall.
No accurate figure can be given for a kitchen renovation without an on-site inspection. The age of the house, the condition of the electrical and plumbing behind the cabinets, and the materials you choose all change the number substantially, which is why we provide a written, itemized estimate after seeing the room rather than a range over the phone.
Walkthrough footage of completed kitchens shows finish quality and detailing in a way that still photography tends to flatter.
Highlights from a completed kitchen remodel.
On-site footage from a completed kitchen remodel showing cabinetry, counters and finish work.
A renovation succeeds or fails on coordination, because the room is small and every trade needs it in a specific order.
We open the sink base, look at the panel and check the floor before quoting, so the estimate reflects the house rather than a template. That front-end work is what keeps change orders rare instead of routine.
Electrical, plumbing, cabinetry, stone fabrication, tile and flooring all have to hand off cleanly in a room you cannot work in two at a time. You call one person, and the sequencing is our problem rather than yours.
A 1968 Bellevue split-level, a Kirkland rambler and a Seattle bungalow each fail in their own predictable ways. Knowing what tends to be behind the wall before it opens is the difference between a planned correction and a stalled jobsite.
We pull what the work requires and schedule inspections at the right stage rather than after drywall. Unpermitted electrical in a kitchen is the kind of thing that surfaces during a future sale, and it is far cheaper to do correctly the first time.
Containment, floor protection along the work path, and daily cleanup are part of the job rather than a favor. Kitchen demolition generates fine dust that will find carpet two rooms away if nothing stops it.
The estimate states what is included, what is excluded and what is an allowance, in plain language. If something changes after demolition, you see the revised cost in writing before anyone proceeds.
Bring us your existing layout and what frustrates you about it. We will tell you honestly what can be improved without moving a wall, and what cannot.
A renovation rebuilds the kitchen within its existing layout, while a remodel changes the layout itself. In a renovation the sink, range and walls stay where they are and everything else is replaced: cabinets, counters, backsplash, flooring, lighting and wiring. A remodel might move the sink to an island, remove a wall to open the room to the dining area, or expand the footprint. Because relocating plumbing and altering structure are the two most expensive things you can do to a kitchen, a renovation typically delivers a larger visible change per dollar spent.
Plan on being without a functioning kitchen for several weeks, with the exact duration driven by cabinet lead time and the condition of the systems behind the walls. The sequence has one unavoidable pause built into it: countertops cannot be templated until cabinets are installed, and fabrication takes time after that. We usually leave the refrigerator connected and set up a temporary sink or prep area elsewhere in the house so the gap is manageable. A realistic schedule is given in writing before work starts, and it is updated if demolition reveals something significant.
Usually yes, because the electrical and plumbing work almost always requires one even when nothing structural changes. Adding circuits, replacing wiring, relocating a receptacle or altering the dishwasher and disposal connections falls under permitted work in King County jurisdictions, and the specifics vary between Bellevue, Redmond, Kirkland, Seattle and unincorporated county areas. Cosmetic work like painting or swapping a countertop generally does not. We confirm what the specific jurisdiction requires for your scope and pull the permits as part of the project.
Sometimes, and it depends entirely on the boxes rather than the doors. If the carcasses are plywood, square, solidly attached to the wall and laid out in a way that still works for you, refacing or new doors and drawer fronts is a legitimate option. If the boxes are particleboard that has swelled at the sink base, or the layout wastes space with fixed shelves where drawers belong, refacing spends real money to keep the least useful part of the kitchen. We give an honest read on which situation you are in after opening a few doors.
The most common findings are outdated wiring, moisture damage at the sink base or exterior wall, and floors that are further out of level than anyone expected. In pre-war Seattle homes, active knob-and-tube wiring still appears behind kitchen walls and has to be replaced rather than extended. In post-war Eastside homes the more typical issue is a kitchen running on too few circuits with no GFCI protection at the counter. Anything discovered is documented and priced in writing before work continues, so you are never approving a number verbally in the middle of a jobsite.
Most households stay put, and it is manageable with some planning. We seal the kitchen with containment, protect the route from the work area to the exterior door, and set up a temporary food-prep zone with the refrigerator, a microwave and a sink you can still reach. The hardest days are demolition and floor work, when noise and dust peak. Households with young children, someone working from home full-time on calls, or respiratory sensitivities sometimes choose to be elsewhere for that stretch.
Yes, and it is the single upgrade homeowners are gladdest they did. Once cabinets are off the wall, running new circuits is straightforward; once new cabinets and a stone counter are installed, the same work becomes disruptive and expensive. Current code generally calls for dedicated small-appliance branch circuits, GFCI protection at countertop receptacles, and receptacle spacing close enough that no usable point along the counter is far from an outlet. Older kitchens rarely meet any of that, and correcting it during a renovation costs a fraction of doing it later.
Less than it would for exterior work, since a kitchen renovation is almost entirely indoors. The one weather-dependent piece is the hood duct termination and any exterior siding patch that goes with it, which is easier in a dry stretch. Wet-season projects also require more attention to tracking moisture through the house during demolition hauling. Otherwise the practical scheduling constraint is cabinet lead time rather than the calendar, so the useful move is to start design early rather than to wait for a particular season.
Sky Pro Remodeling renovates kitchens throughout Bellevue, Kirkland, Redmond, Sammamish, Issaquah, Bothell, Renton and the surrounding Eastside communities, along with neighborhoods across Seattle. The housing stock changes noticeably as you cross the lake, and the way a kitchen renovation is planned changes with it.
Do not see your neighborhood? Call (206) 825-2773 — we regularly work throughout King County.
EXCELLENT Based on 57 reviews Posted on pinnyTrustindex verifies that the original source of the review is Google. Didn’t know what to expect at first but these guys blew the winds off my hat I mean seriously, I had a bathtub renovated to a built in shower and my God am I satisfied with their work. If anyone is considering going with these guys for a remodel I’d vouch for sure.Posted on Nathaniel CardenasTrustindex verifies that the original source of the review is Google. They did a good job on my Deck remodeling project, finished in such a short time and gave me a professional run-down on the material and labor cost. Highly recommend.Posted on Natalie GalvanTrustindex verifies that the original source of the review is Google. I usually don’t trust these companies but Sky Pro blew my expectations out of the water. I seriously am so glad they contacted me, I have 2 bathrooms in my home that both needed to be completely remodeled and they nailed my vision down for both. I couldn’t be happier with this and can recommend them to anyone, even locally.Posted on Samantha RoblesTrustindex verifies that the original source of the review is Google. I ended up going with Sky Pro for my roof project, they did an amazing job and the team didn’t fail to keep me assured the entire process through. 🙏🏽Posted on SophisticatedTrustindex verifies that the original source of the review is Google. Sky Pro came to do my concrete driveway project a couple weeks ago and, they were very respectful and easy to communicate with, very satisfied with their work.Posted on Tanner JacobsTrustindex verifies that the original source of the review is Google. These guy did a great job extending out our back patio. We have existing exposed aggregate and they matched the design perfectly. From the start Ben always made sure we were happy and all our questions were answered. We will definitely use them again for future concrete projects.Posted on Christian BlancoTrustindex verifies that the original source of the review is Google. Sky Pro came out and gave me a quote for my flooring project, they sent a wonderful contractor and he explained to me what was best regarding material costs. Definitely will be going with them! Contractor was actually really cool with the process and showed me some previews on how it should lookPosted on Pablo Blanco foloresTrustindex verifies that the original source of the review is Google. Got my deck looked at by SkyPro, ended up going with them for repairs and they did an amazing job. We made a deal with the pricing as well so I'm actually looking forward to booking with them soon when I wanna get my other project done.Posted on Sidney ArchieTrustindex verifies that the original source of the review is Google. SkyPro did my kitchen remodel project and I am so glad I went with them because now I’m walking into a palace every time I’m home. Really appreciate them!Verified by TrustindexTrustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more

A closer look at where restoring an existing kitchen ends and a full remodel begins, which is the same decision this page centers on.
Learn more
Useful background on the specific issues that surface in mid-century Eastside houses once the walls come open.
Learn more
Walks through the variables that determine kitchen budgets locally, worth reading before you set expectations for your own project.